| By PR Newswire | Article Rating: |
|
| January 17, 2013 11:52 AM EST | Reads: |
117 |
VANCOUVER, British Columbia, Jan. 17, 2013 /PRNewswire/ -- Pacific Booker Minerals Inc. (NYSE MKT: PBM), (BKM.V) Reiterates a positive Feasibility Study, as defined by National Instrument 43-101, was released by the Company for its 100% owned Morrison Copper/Gold Project in February 2009. The study described the scope, design and financial viability of a conventional open pit mine with a 30,000 tonnes per day mill with a 21 year mine life.
The proven and probable mineable reserve was estimated to be 224.25 Mt with an average grade of 0.33% Copper, 0.163 g/t Gold and 0.004% Molybdenum. The Capital cost estimate was CDN $516.68 million (including a CDN $59.92 million contingency allocation) and operating cost was CDN $8.15 per tonne milled over the life of the mine. The Pre-Income Tax Internal Rate of Return ("IRR") was 20.05%, based on metal prices of (four year trailing average as of January 12, 2009) Copper ($2.75), Gold ($658.32) and Molybdenum ($29.23). The Net Present Value ("NPV") at 8.0% discount rate was CDN $495.9M.
Using a 5.0% discount rate, the NPV based on the Feasibility Study is estimated to be CDN $790M. The Feasibility Study used historical four-year average metal prices calculated as of January 12, 2009. The current upward trend in metal prices has resulted in metals trading at prices that are currently higher than their respective four year average price with the exception of molybdenum, which is lower. The CDN to US dollar exchange rate has increased since the Feasibility Study.
Silver was not included in the financial analysis; however, there is an opportunity for improved economic performance if silver credits are received from the treatment and refining of the copper concentrate. Metallurgical test-work to date has reported silver present in the concentrate. The Company's current share capital is 14.9 M shares fully diluted including 250,000 common voting shares to be issued to Xstrata (formerly Noranda, Falconbridge) upon the start of commercial production as part of the purchase agreement with Noranda.
The mineral reserve estimates have been prepared and classified in accordance with CIM Classification established under National Instrument 43-101 of the Canadian Securities Administrators. The reserve estimate takes into consideration all geologic, mining, milling and economic factors and is stated according to Canadian Standards (NI 43-101). Under US standards, no reserve declaration is possible until financing and permits are acquired.
The Company wishes to emphasize that it is strongly committed to continue to work towards bringing the proposed Morrison Copper/Gold Project to commercial production.
If you would like to be added to our email newsgroup, please send your request by email to info@pacificbooker.com.
Contact:
Gregory R Anderson
Director, CEO and President
1-800-747-9911
1-800-324-3680
SOURCE Pacific Booker Minerals Inc.
Published January 17, 2013 Reads 117
Copyright © 2013 SYS-CON Media, Inc. — All Rights Reserved.
Syndicated stories and blog feeds, all rights reserved by the author.
More Stories By PR Newswire
Copyright © 2007 PR Newswire. All rights reserved. Republication or redistribution of PRNewswire content is expressly prohibited without the prior written consent of PRNewswire. PRNewswire shall not be liable for any errors or delays in the content, or for any actions taken in reliance thereon.
- Cloud People: A Who's Who of Cloud Computing
- Windows Azure IaaS Reaches General Availability
- AMD and Adobe Collaborate on Upcoming Version of Adobe Premiere Pro Software to Enable Breakthrough Video Editing Performance Through Open Standards
- State and Local Governments Adopt Microsoft Dynamics CRM to Improve Citizen Service Delivery
- New Relic Q1 2013 Blazes Past Growth Targets and Reaches 40,000 Active Customer Accounts
- Predixion Software Announces General Availability of the Latest Version of its Predictive Analytics Platform
- Cloud Expo New York: Deploying Hybrid Cloud for Performance and Uptime
- Symphony EYC Appoints New Account Manager to Drive Global Opportunities
- Cloud Computing Is Simplifying Things
- CollabNet And UC4 Announce General Availability Of Joint Enterprise DevOps Platform
- Cloud Expo New York: Developing the World’s First IaaS Marketplace
- Session Topics: 12th Cloud Expo / Cloud Expo New York
- Cloud People: A Who's Who of Cloud Computing
- Cloud Expo New York: Best CIO Practices Shared from SHI’s Customers
- Windows Azure IaaS Reaches General Availability
- AMD and Adobe Collaborate on Upcoming Version of Adobe Premiere Pro Software to Enable Breakthrough Video Editing Performance Through Open Standards
- State and Local Governments Adopt Microsoft Dynamics CRM to Improve Citizen Service Delivery
- New Relic Q1 2013 Blazes Past Growth Targets and Reaches 40,000 Active Customer Accounts
- The PostOpen Event – Why It Is So Important
- The Cover and the Epilogue of the Upcoming Book
- Predixion Software Announces General Availability of the Latest Version of its Predictive Analytics Platform
- Cloud Expo New York: Deploying Hybrid Cloud for Performance and Uptime
- Small Cancers, Big Data, and a Life Examined
- Global Micro Servers Market (2013 - 2018), By Processor Type (Intel, Arm, Amd), Component (Hardware, Software, Operating System), Application (Media Storage, Data Centers, Analytics, Cloud Computing) & Geography (North America, Europe, Apac, Row)
- Google Maps and ASP.NET
- Converting VB6 to VB.NET, Part I
- How to Write High-Performance C# Code
- Crystal Reports XI & How It Has Changed
- Where Are RIA Technologies Headed in 2008?
- Creating Controls for.NET Compact Framework in Visual Studio 2005
- Programmatically Posting Data to ASP .NET Web Applications
- Implementing Tab Navigation with ASP.NET 2.0
- AJAX World RIA Conference & Expo Kicks Off in New York City
- i-Technology Viewpoint: "SOA Sucks"
- .NET Archives: Getting Reacquainted with the Father of C#
- i-Technology Photo Exclusive: Bill Gates & Steve Jobs In "Nerds"























