Welcome!

Microsoft Cloud Authors: Pat Romanski, Srinivasan Sundara Rajan, Glenn Rossman, Janakiram MSV, Steven Mandel

News Feed Item

Mercator Minerals Reports Third Quarter 2012 Results

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/15/12 --

(All US$ unless otherwise specified)

Mercator Minerals Ltd (TSX:ML) ("Mercator" or the "Company") today announced its financial results for the three months and nine months ended September 30, 2012. During the third quarter 2012, the Company generated revenues of $58.5 million and gross profit of $4.7 million, in spite of a buildup of 2.3 million pounds of copper in concentrate inventory at the port which was subsequently shipped in the first week of October, cash flow from operations (excluding changes in non-cash working capital items) of $2.1 million, and a net loss of $15.1 million ($0.06 per share, basic), or on an adjusted net earnings(i) basis, a loss of $3.7 million ($0.01 per share, basic).

"We are pleased with continued production improvements being achieved, including the record metal recoveries and output this quarter despite the power interruptions at Mineral Park," stated Bruce McLeod, President & CEO of Mercator. "In the upcoming quarters, we expect further optimization will allow us to continue to deliver higher quarter over quarter metal production while achieving lower unit costs."

THIRD QUARTER 2012 HIGHLIGHTS


--  Record copper equivalent production of 22.2 million pounds, comprised of
    10.7 million pounds of copper in concentrates and cathode, 2.5 million
    pounds of molybdenum in concentrates and 154,000 ounces of silver. 
--  Record metal recoveries were achieved, with copper and molybdenum
    recoveries for the quarter of 84.5% and 82.4%, respectively, which is 6%
    and 10% higher, respectively than design. 
--  Throughput averaged 42,042 tons per day ("tpd"), lower than expected due
    to 16 days of unscheduled partial downtime associated with power
    availability. 
--  Total cash costs(i), which is calculated on a co-product basis and
    allocates total cash costs(i) on the percentage of sales revenues by
    each product, were $2.67 per pound of copper produced and $9.49 per
    pound of molybdenum produced. 
--  Revenues in the third quarter 2012, as compared to the same quarter of
    2011, were impacted by lower molybdenum prices realized and lower copper
    sales volumes due primarily to the buildup of 2.3 million pounds of
    copper inventory at the port, which was not shipped until the first week
    of October (total copper in concentrate inventory at quarter-end was 3.5
    million pounds, an increase of 2.3 million pounds over last quarter's
    inventory levels of 1.2 million pounds). Revenues were positively
    impacted by higher copper prices realized and higher molybdenum sales
    volumes. 
--  Cash flow from stand-alone Mineral Park operations, after the cost of
    hedging, was $2.5 million in the third quarter of 2012. 

Copper equivalent production throughout this press release is calculated using a molybdenum/copper ratio of 4.53, based on the Company's estimated 2012 metal prices, including copper hedges.


----------------------------------------------------------------------------
                                     Three months ended,  Nine months ended,
$ millions, unless otherwise noted          September 30        September 30
                                    ----------------------------------------
                                          2012      2011      2012      2011
----------------------------------------------------------------------------
Revenues                                  58.5      64.0     185.1     192.3
----------------------------------------------------------------------------
Gross profit                               4.7      10.9      23.4      48.3
----------------------------------------------------------------------------
Net (loss) income                       (15.1)     106.8    (13.5)     124.6
(Loss) earnings per share, basic       $(0.06)      0.43   $(0.05)      0.57
----------------------------------------------------------------------------
Adjusted net (loss) income (i)           (3.7)       0.8     (5.7)       6.6
Adjusted (loss) earnings per share     
 (i)                                   $(0.01)     $ nil   $(0.02)     $0.03
----------------------------------------------------------------------------
Cash flow from operations                (3.6)      23.2       1.4      53.5
----------------------------------------------------------------------------
Production (million pounds)                                                 
- Copper                                  10.7      10.5      30.1      31.1
- Molybdenum                               2.5       2.0       7.4       4.7
- Copper equivalent basis                 22.2      19.6      63.6      52.4
----------------------------------------------------------------------------
Throughput (tons per day)               42,042    36,151    45,769    32,551
----------------------------------------------------------------------------
Recoveries (%)                                                              
- Copper                                  84.5      77.2      78.8      76.2
- Molybdenum                              82.4      76.6      77.4      68.3
----------------------------------------------------------------------------
On-site operating costs ($/ ton                                             
 milled)                                 11.28     11.38     10.11     11.69
----------------------------------------------------------------------------
Cash costs(i) on a co-product basis                                         
 ($/lb)                                                                     
- Copper                                  2.67      2.37      2.45      2.19
- Molybdenum                              9.49     10.99     10.69     12.21
----------------------------------------------------------------------------
Average realized prices ($/lb)                                              
- Copper (excluding hedges)               3.65      3.32      3.71      4.00
- Molybdenum                             10.71     14.56     12.54     15.65
----------------------------------------------------------------------------

Operating Highlights

Mineral Park Mine

In the third quarter of 2012, the Mineral Park operations performed well, with record quarterly copper equivalent production of 22.2 million pounds, which was 10% and 4% higher than the first and second quarters of 2012, respectively. Mineral Park produced 10.7 million pounds of copper (9.8 million pounds in concentrates and 0.9 million pounds in cathode) and 2.5 million pounds of molybdenum. Despite the strong production, the quarter was impacted by 16 days of unexpected partial power availability resulting from the necessity of having to take the on-site gas turbine out of service. A scheduled maintenance inspection of the turbine in August 2012 revealed some damaged components and resulted in a leased turbine unit being installed while the original unit undergoes repairs. The unexpected change-out resulted in 68% less power being available to the mill for seven days during the quarter. A further nine days of power supply disruptions during the quarter was experienced due to turbine downtime for follow-up inspections of the leased turbine and seasonal weather disruptions at both the utility provider and the mine site. The reduced power available negatively impacted metal production, throughput rates and on-site operating unit costs for the quarter.

Copper and molybdenum recoveries continue to be above target levels, averaging 84.5% and 82.4% for the quarter respectively, or 6% and 10%, respectively, better than target recovery rates of 80% and 75%. The Company believes the improved recovery rates are sustainable and are due in part to improved flotation practices, optimized use of reagents, and ore mineralogy.

Fourth Quarter 2012 Mineral Park Outlook

The Company expects to produce approximately 22.8 million copper equivalent pounds of copper in the fourth quarter 2012, comprised of 10.4 million pounds of copper (9.5 million pounds copper in concentrate and 0.9 million pounds of cathode copper) and 2.8 million pounds of molybdenum in concentrate.

The Company is in the process of updating Mineral Park resource and reserve estimate which it expects will be released in early 2013, along with the Company's production expectations for fiscal 2013.

El Pilar Project

On October 19, 2012, the Company filed on SEDAR (www.sedar.com) an updated El Pilar Feasibility Study ("Study"), a National Instrument 43-101 ("NI 43-101") compliant technical report for the El Pilar Project. The Study, which provides an update to the Feasibility Study issued in November 2011, continues to support the case for the development of a robust, economically feasible copper project at the Company's wholly-owned El Pilar Project in northern Mexico. The Study, using a average life-of-mine copper price of $2.82 per pound, indicated a net present value ("NPV") after-tax, discounted at 8%, of $416.0 million; internal rate of return ("IRR"), after-tax, of 36.6%; and payback period of 1.8 years. The project has an expected average life of mine total cash costs(i) are $1.34 per pound of payable copper, offers low capital intensity with initial capital of $280.0 million to produce life-of-mine ("LOM") average annual production of 79.3 million pounds of copper cathode. The 13-year mine life is expected to produce 998.3 million pounds of copper.

The Study highlights various opportunities to increase the value of the El Pilar Project, as additional metallurgical tests show that, using three meter lift heights may provide greater copper extraction over a 360-day leach cycle as compared to the 180-day leach cycle used in the Study's base case. This is due to continued copper extraction over time in the multi-lift heap configuration. If realized, this opportunity could result in an increase of 14% in total copper recovered to 1,142 billion pounds; an increase of 13% in the average life of mine recoveries to 64.9%; a 36% increase in after-tax NPV8% to $565.6 million; a 18% increase in the IRR to 43.3%; and payback improves to 1.7 years.

The El Pilar Project is construction-ready, with approval for all environmental permits needed for construction having been received and the acquisition of all required surface land rights having been completed. Important permits received recently include Notice of Approval of the Change of Land Use (CUS) Permit on August 23, 2012 and the MIA Study Approval Resolution for the access road and railroad spur on September 21, 2012.

For readers to fully understand the El Pilar Project, they should read the Study in its entirety, including all qualifications, assumptions and exclusions that relate to the information set out in this news release. The Study is intended to be read as a whole, and sections should not be read or relied upon out of context. The technical information in the Study is subject to the assumptions and qualifications contained therein.

Financial Statements and Management Discussion & Analysis (MD&A)

This news release should be read in conjunction with the MD&A and Financial Statements for the three and nine month period ended September 30, 2012 which will be posted on Mercator's website (www.mercatorminerals.com/s/FinancialStatements.asp) and on SEDAR (www.sedar.com) under the Company's profile.

(i) Alternative Performance Measures

This press release refers to "cash costs" and "adjusted net income (loss)" which are not performance measures recognized as having a standardized meaning under IFRS. The Company discloses these performance measures (marked with an (i)), which have been derived from our financial statements on a consistent basis, because we believe they are of assistance in understanding our results of operations and financial position and are meant to provide further information about our financial results. These performance measures may not be comparable to similar data presented by other mining companies. This information should not be considered in isolation or as a substitute for measure of performance prepared in accordance with IFRS. Readers should refer to "Alternative Performance Measures" section on page 27 of the MD&A for additional information on these measures.

Webcast/Conference Call

Mercator's senior management will hold a conference call and a live audio webcast on November 15, 2012 at 8:30 a.m. Pacific time to discuss results for the third quarter 2012. To participate in the call, dial 877-240-9772 (North America) and 800-2787-2090 (International). To listen to the live webcast, visit www.gowebcasting.com/3844. A presentation will accompany the call and will be available on the company's website under www.mercatorminerals.com/s/Presentations.asp.

An archived recording of the conference call will be available for playback after the event until November 29, 2012 by dialling 1-800-408-3053 (North America), 800-3366-3052 (International) with conference pass code 8809732#.

About Mercator Minerals Ltd.

Mercator Minerals Ltd., a TSX listed Canadian mining company with the potential to have one of the fastest growing base metal profiles in its peer group, is a copper, molybdenum and silver producer with a diversified portfolio of high quality assets in the USA and Mexico. Mercator provides investors exposure to current copper, molybdenum and silver production from the large tonnage long life Mineral Park Mine in Arizona, as well as mid-term exposure to potential copper production from its El Pilar deposit in the State of Sonora in northern Mexico and longer term exposure of molybdenum and copper through the potential development of the El Creston deposit also in the State of Sonora in northern Mexico.

For further information please visit www.mercatorminerals.com.

On Behalf of the Board of Directors

MERCATOR MINERALS LTD.

D. Bruce McLeod, P.Eng., President and CEO

National Instrument 43-101 Compliance

Unless otherwise indicated, Mercator has prepared the technical information in this news release ("Technical Information") based on information contained in the technical reports, news releases, material change reports and quarterly and annual consolidated financial statements and management discussion and analysis (collectively the "Disclosure Documents") available under Mercator Minerals Ltd.'s company profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by or under the supervision of a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administration ("NI 43-101"). Readers are encouraged to review the full text of the Disclosure Documents which qualifies the Technical Information. Readers are advised that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The Technical Information contained in this news release of has been prepared under the supervision of, and its disclosure has been reviewed by the following who are deemed to be Qualified Persons under NI 43-101: Gary Simmerman, BSC, Mining Eng., FAusIMM, Mercator's Vice President, Mineral Park Mine and Mike Broch, BSC Geology, MSSC Economic Geology, FAusIMM, the Company's Vice-President, Exploration and Evaluations.

Forward-Looking Information

This press release contains certain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements", are not historical facts, are made as of the date of this press release and include without limitation, statements regarding discussions of future plans, guidance, projections, objectives, estimates and forecasts and statements as to management's expectations with respect to, among other things, the size, grade and quality of the Company's mineral reserves and mineral resources, potential mineralization, and possible extensions of zones. In addition, estimates of mineral reserves and mineral resources may constitute forward looking statements to the extent they involve estimates of the mineralization that will be encountered if a property is developed. These forward-looking statements involve numerous risks and uncertainties and actual results may vary. Important factors that may cause actual results to vary include without limitation, certain transactions, certain approvals, changes in commodity and power prices, changes in interest and currency exchange rates, risks inherent in exploration results, timing and success, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications, cost escalation, unavailability of materials, equipment and third-party contractors, delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, the assumptions that:

(1) market fundamentals will result in sustained copper and molybdenum demand and prices; (2) the current copper leach operations at Mineral Park remain viable, operationally and economically; (3) the milling operations at Mineral Park will continue to be viable, operationally and economically; (4) the financing, construction and operation of the El Pilar Project will proceed as expected; and (5) any additional financing needed will be available on reasonable terms. The Company's ability to progress the El Pilar and El Creston projects towards a construction decision and eventually into production is dependent on the Company's ability to arrange for sufficient funds to cover the capital and start-up related costs. There can be no assurance that the Company will be successful in arranging such funding. Statements concerning mineral reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that may be encountered during current or future operations. The words "guidance", "expect," "anticipate," "estimate," "may," "will," "should," "intend," "believe," "target," "budget," "plan," "projection" and similar expressions are intended to identify forward-looking statements. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. The risks and assumptions are described in more detail in the Company's Annual Information Form, audited financial statements and MD&A for the year ended December 31, 2011 on the SEDAR website at www.sedar.com. The Company does not assume the obligation to revise or update these forward-looking statements after the date of this news release or to revise them to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

@ThingsExpo Stories
In his session at @ThingsExpo, Kausik Sridharabalan, founder and CTO of Pulzze Systems, Inc., will focus on key challenges in building an Internet of Things solution infrastructure. He will shed light on efficient ways of defining interactions within IoT solutions, leading to cost and time reduction. He will also introduce ways to handle data and how one can develop IoT solutions that are lean, flexible and configurable, thus making IoT infrastructure agile and scalable.
SYS-CON Events announced today that Sheng Liang to Keynote at SYS-CON's 19th Cloud Expo, which will take place on November 1-3, 2016 at the Santa Clara Convention Center in Santa Clara, California.
Just over a week ago I received a long and loud sustained applause for a presentation I delivered at this year’s Cloud Expo in Santa Clara. I was extremely pleased with the turnout and had some very good conversations with many of the attendees. Over the next few days I had many more meaningful conversations and was not only happy with the results but also learned a few new things. Here is everything I learned in those three days distilled into three short points.
Cognitive Computing is becoming the foundation for a new generation of solutions that have the potential to transform business. Unlike traditional approaches to building solutions, a cognitive computing approach allows the data to help determine the way applications are designed. This contrasts with conventional software development that begins with defining logic based on the current way a business operates. In her session at 18th Cloud Expo, Judith S. Hurwitz, President and CEO of Hurwitz & ...
So, you bought into the current machine learning craze and went on to collect millions/billions of records from this promising new data source. Now, what do you do with them? Too often, the abundance of data quickly turns into an abundance of problems. How do you extract that "magic essence" from your data without falling into the common pitfalls? In her session at @ThingsExpo, Natalia Ponomareva, Software Engineer at Google, provided tips on how to be successful in large scale machine learning...
An IoT product’s log files speak volumes about what’s happening with your products in the field, pinpointing current and potential issues, and enabling you to predict failures and save millions of dollars in inventory. But until recently, no one knew how to listen. In his session at @ThingsExpo, Dan Gettens, Chief Research Officer at OnProcess, will discuss recent research by Massachusetts Institute of Technology and OnProcess Technology, where MIT created a new, breakthrough analytics model f...
The Transparent Cloud-computing Consortium (abbreviation: T-Cloud Consortium) will conduct research activities into changes in the computing model as a result of collaboration between "device" and "cloud" and the creation of new value and markets through organic data processing High speed and high quality networks, and dramatic improvements in computer processing capabilities, have greatly changed the nature of applications and made the storing and processing of data on the network commonplace.
The Internet of Things can drive efficiency for airlines and airports. In their session at @ThingsExpo, Shyam Varan Nath, Principal Architect with GE, and Sudip Majumder, senior director of development at Oracle, will discuss the technical details of the connected airline baggage and related social media solutions. These IoT applications will enhance travelers' journey experience and drive efficiency for the airlines and the airports. The session will include a working demo and a technical d...
In this strange new world where more and more power is drawn from business technology, companies are effectively straddling two paths on the road to innovation and transformation into digital enterprises. The first path is the heritage trail – with “legacy” technology forming the background. Here, extant technologies are transformed by core IT teams to provide more API-driven approaches. Legacy systems can restrict companies that are transitioning into digital enterprises. To truly become a lea...
Almost two-thirds of companies either have or soon will have IoT as the backbone of their business in 2016. However, IoT is far more complex than most firms expected. How can you not get trapped in the pitfalls? In his session at @ThingsExpo, Tony Shan, a renowned visionary and thought leader, will introduce a holistic method of IoTification, which is the process of IoTifying the existing technology and business models to adopt and leverage IoT. He will drill down to the components in this fra...
Digital transformation is too big and important for our future success to not understand the rules that apply to it. The first three rules for winning in this age of hyper-digital transformation are: Advantages in speed, analytics and operational tempos must be captured by implementing an optimized information logistics system (OILS) Real-time operational tempos (IT, people and business processes) must be achieved Businesses that can "analyze data and act and with speed" will dominate those t...
If you had a chance to enter on the ground level of the largest e-commerce market in the world – would you? China is the world’s most populated country with the second largest economy and the world’s fastest growing market. It is estimated that by 2018 the Chinese market will be reaching over $30 billion in gaming revenue alone. Admittedly for a foreign company, doing business in China can be challenging. Often changing laws, administrative regulations and the often inscrutable Chinese Interne...
I'm a lonely sensor. I spend all day telling the world how I'm feeling, but none of the other sensors seem to care. I want to be connected. I want to build relationships with other sensors to be more useful for my human. I want my human to understand that when my friends next door are too hot for a while, I'll soon be flaming. And when all my friends go outside without me, I may be left behind. Don't just log my data; use the relationship graph. In his session at @ThingsExpo, Ryan Boyd, Engi...
Internet of @ThingsExpo, taking place November 1-3, 2016, at the Santa Clara Convention Center in Santa Clara, CA, is co-located with the 19th International Cloud Expo and will feature technical sessions from a rock star conference faculty and the leading industry players in the world and ThingsExpo Silicon Valley Call for Papers is now open.
Adobe is changing the world though digital experiences. Adobe helps customers develop and deliver high-impact experiences that differentiate brands, build loyalty, and drive revenue across every screen, including smartphones, computers, tablets and TVs. Adobe content solutions are used daily by millions of companies worldwide-from publishers and broadcasters, to enterprises, marketing agencies and household-name brands. Building on its established design leadership, Adobe enables customers not o...
If you’re responsible for an application that depends on the data or functionality of various IoT endpoints – either sensors or devices – your brand reputation depends on the security, reliability, and compliance of its many integrated parts. If your application fails to deliver the expected business results, your customers and partners won't care if that failure stems from the code you developed or from a component that you integrated. What can you do to ensure that the endpoints work as expect...
SYS-CON Events announced today that ReadyTalk, a leading provider of online conferencing and webinar services, has been named Vendor Presentation Sponsor at the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. ReadyTalk delivers audio and web conferencing services that inspire collaboration and enable the Future of Work for today’s increasingly digital and mobile workforce. By combining intuitive, innovative tec...
WebRTC adoption has generated a wave of creative uses of communications and collaboration through websites, sales apps, customer care and business applications. As WebRTC has become more mainstream it has evolved to use cases beyond the original peer-to-peer case, which has led to a repeating requirement for interoperability with existing infrastructures. In his session at @ThingsExpo, Graham Holt, Executive Vice President of Daitan Group, will cover implementation examples that have enabled ea...
There is growing need for data-driven applications and the need for digital platforms to build these apps. In his session at 19th Cloud Expo, Muddu Sudhakar, VP and GM of Security & IoT at Splunk, will cover different PaaS solutions and Big Data platforms that are available to build applications. In addition, AI and machine learning are creating new requirements that developers need in the building of next-gen apps. The next-generation digital platforms have some of the past platform needs a...
Fifty billion connected devices and still no winning protocols standards. HTTP, WebSockets, MQTT, and CoAP seem to be leading in the IoT protocol race at the moment but many more protocols are getting introduced on a regular basis. Each protocol has its pros and cons depending on the nature of the communications. Does there really need to be only one protocol to rule them all? Of course not. In his session at @ThingsExpo, Chris Matthieu, co-founder and CTO of Octoblu, walk you through how Oct...