Welcome!

Microsoft Cloud Authors: Pat Romanski, Elizabeth White, Liz McMillan, Mihai Corbuleac, David Bermingham

News Feed Item

Mercator Minerals Reports Third Quarter 2012 Results

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 11/15/12 --

(All US$ unless otherwise specified)

Mercator Minerals Ltd (TSX:ML) ("Mercator" or the "Company") today announced its financial results for the three months and nine months ended September 30, 2012. During the third quarter 2012, the Company generated revenues of $58.5 million and gross profit of $4.7 million, in spite of a buildup of 2.3 million pounds of copper in concentrate inventory at the port which was subsequently shipped in the first week of October, cash flow from operations (excluding changes in non-cash working capital items) of $2.1 million, and a net loss of $15.1 million ($0.06 per share, basic), or on an adjusted net earnings(i) basis, a loss of $3.7 million ($0.01 per share, basic).

"We are pleased with continued production improvements being achieved, including the record metal recoveries and output this quarter despite the power interruptions at Mineral Park," stated Bruce McLeod, President & CEO of Mercator. "In the upcoming quarters, we expect further optimization will allow us to continue to deliver higher quarter over quarter metal production while achieving lower unit costs."

THIRD QUARTER 2012 HIGHLIGHTS


--  Record copper equivalent production of 22.2 million pounds, comprised of
    10.7 million pounds of copper in concentrates and cathode, 2.5 million
    pounds of molybdenum in concentrates and 154,000 ounces of silver. 
--  Record metal recoveries were achieved, with copper and molybdenum
    recoveries for the quarter of 84.5% and 82.4%, respectively, which is 6%
    and 10% higher, respectively than design. 
--  Throughput averaged 42,042 tons per day ("tpd"), lower than expected due
    to 16 days of unscheduled partial downtime associated with power
    availability. 
--  Total cash costs(i), which is calculated on a co-product basis and
    allocates total cash costs(i) on the percentage of sales revenues by
    each product, were $2.67 per pound of copper produced and $9.49 per
    pound of molybdenum produced. 
--  Revenues in the third quarter 2012, as compared to the same quarter of
    2011, were impacted by lower molybdenum prices realized and lower copper
    sales volumes due primarily to the buildup of 2.3 million pounds of
    copper inventory at the port, which was not shipped until the first week
    of October (total copper in concentrate inventory at quarter-end was 3.5
    million pounds, an increase of 2.3 million pounds over last quarter's
    inventory levels of 1.2 million pounds). Revenues were positively
    impacted by higher copper prices realized and higher molybdenum sales
    volumes. 
--  Cash flow from stand-alone Mineral Park operations, after the cost of
    hedging, was $2.5 million in the third quarter of 2012. 

Copper equivalent production throughout this press release is calculated using a molybdenum/copper ratio of 4.53, based on the Company's estimated 2012 metal prices, including copper hedges.


----------------------------------------------------------------------------
                                     Three months ended,  Nine months ended,
$ millions, unless otherwise noted          September 30        September 30
                                    ----------------------------------------
                                          2012      2011      2012      2011
----------------------------------------------------------------------------
Revenues                                  58.5      64.0     185.1     192.3
----------------------------------------------------------------------------
Gross profit                               4.7      10.9      23.4      48.3
----------------------------------------------------------------------------
Net (loss) income                       (15.1)     106.8    (13.5)     124.6
(Loss) earnings per share, basic       $(0.06)      0.43   $(0.05)      0.57
----------------------------------------------------------------------------
Adjusted net (loss) income (i)           (3.7)       0.8     (5.7)       6.6
Adjusted (loss) earnings per share     
 (i)                                   $(0.01)     $ nil   $(0.02)     $0.03
----------------------------------------------------------------------------
Cash flow from operations                (3.6)      23.2       1.4      53.5
----------------------------------------------------------------------------
Production (million pounds)                                                 
- Copper                                  10.7      10.5      30.1      31.1
- Molybdenum                               2.5       2.0       7.4       4.7
- Copper equivalent basis                 22.2      19.6      63.6      52.4
----------------------------------------------------------------------------
Throughput (tons per day)               42,042    36,151    45,769    32,551
----------------------------------------------------------------------------
Recoveries (%)                                                              
- Copper                                  84.5      77.2      78.8      76.2
- Molybdenum                              82.4      76.6      77.4      68.3
----------------------------------------------------------------------------
On-site operating costs ($/ ton                                             
 milled)                                 11.28     11.38     10.11     11.69
----------------------------------------------------------------------------
Cash costs(i) on a co-product basis                                         
 ($/lb)                                                                     
- Copper                                  2.67      2.37      2.45      2.19
- Molybdenum                              9.49     10.99     10.69     12.21
----------------------------------------------------------------------------
Average realized prices ($/lb)                                              
- Copper (excluding hedges)               3.65      3.32      3.71      4.00
- Molybdenum                             10.71     14.56     12.54     15.65
----------------------------------------------------------------------------

Operating Highlights

Mineral Park Mine

In the third quarter of 2012, the Mineral Park operations performed well, with record quarterly copper equivalent production of 22.2 million pounds, which was 10% and 4% higher than the first and second quarters of 2012, respectively. Mineral Park produced 10.7 million pounds of copper (9.8 million pounds in concentrates and 0.9 million pounds in cathode) and 2.5 million pounds of molybdenum. Despite the strong production, the quarter was impacted by 16 days of unexpected partial power availability resulting from the necessity of having to take the on-site gas turbine out of service. A scheduled maintenance inspection of the turbine in August 2012 revealed some damaged components and resulted in a leased turbine unit being installed while the original unit undergoes repairs. The unexpected change-out resulted in 68% less power being available to the mill for seven days during the quarter. A further nine days of power supply disruptions during the quarter was experienced due to turbine downtime for follow-up inspections of the leased turbine and seasonal weather disruptions at both the utility provider and the mine site. The reduced power available negatively impacted metal production, throughput rates and on-site operating unit costs for the quarter.

Copper and molybdenum recoveries continue to be above target levels, averaging 84.5% and 82.4% for the quarter respectively, or 6% and 10%, respectively, better than target recovery rates of 80% and 75%. The Company believes the improved recovery rates are sustainable and are due in part to improved flotation practices, optimized use of reagents, and ore mineralogy.

Fourth Quarter 2012 Mineral Park Outlook

The Company expects to produce approximately 22.8 million copper equivalent pounds of copper in the fourth quarter 2012, comprised of 10.4 million pounds of copper (9.5 million pounds copper in concentrate and 0.9 million pounds of cathode copper) and 2.8 million pounds of molybdenum in concentrate.

The Company is in the process of updating Mineral Park resource and reserve estimate which it expects will be released in early 2013, along with the Company's production expectations for fiscal 2013.

El Pilar Project

On October 19, 2012, the Company filed on SEDAR (www.sedar.com) an updated El Pilar Feasibility Study ("Study"), a National Instrument 43-101 ("NI 43-101") compliant technical report for the El Pilar Project. The Study, which provides an update to the Feasibility Study issued in November 2011, continues to support the case for the development of a robust, economically feasible copper project at the Company's wholly-owned El Pilar Project in northern Mexico. The Study, using a average life-of-mine copper price of $2.82 per pound, indicated a net present value ("NPV") after-tax, discounted at 8%, of $416.0 million; internal rate of return ("IRR"), after-tax, of 36.6%; and payback period of 1.8 years. The project has an expected average life of mine total cash costs(i) are $1.34 per pound of payable copper, offers low capital intensity with initial capital of $280.0 million to produce life-of-mine ("LOM") average annual production of 79.3 million pounds of copper cathode. The 13-year mine life is expected to produce 998.3 million pounds of copper.

The Study highlights various opportunities to increase the value of the El Pilar Project, as additional metallurgical tests show that, using three meter lift heights may provide greater copper extraction over a 360-day leach cycle as compared to the 180-day leach cycle used in the Study's base case. This is due to continued copper extraction over time in the multi-lift heap configuration. If realized, this opportunity could result in an increase of 14% in total copper recovered to 1,142 billion pounds; an increase of 13% in the average life of mine recoveries to 64.9%; a 36% increase in after-tax NPV8% to $565.6 million; a 18% increase in the IRR to 43.3%; and payback improves to 1.7 years.

The El Pilar Project is construction-ready, with approval for all environmental permits needed for construction having been received and the acquisition of all required surface land rights having been completed. Important permits received recently include Notice of Approval of the Change of Land Use (CUS) Permit on August 23, 2012 and the MIA Study Approval Resolution for the access road and railroad spur on September 21, 2012.

For readers to fully understand the El Pilar Project, they should read the Study in its entirety, including all qualifications, assumptions and exclusions that relate to the information set out in this news release. The Study is intended to be read as a whole, and sections should not be read or relied upon out of context. The technical information in the Study is subject to the assumptions and qualifications contained therein.

Financial Statements and Management Discussion & Analysis (MD&A)

This news release should be read in conjunction with the MD&A and Financial Statements for the three and nine month period ended September 30, 2012 which will be posted on Mercator's website (www.mercatorminerals.com/s/FinancialStatements.asp) and on SEDAR (www.sedar.com) under the Company's profile.

(i) Alternative Performance Measures

This press release refers to "cash costs" and "adjusted net income (loss)" which are not performance measures recognized as having a standardized meaning under IFRS. The Company discloses these performance measures (marked with an (i)), which have been derived from our financial statements on a consistent basis, because we believe they are of assistance in understanding our results of operations and financial position and are meant to provide further information about our financial results. These performance measures may not be comparable to similar data presented by other mining companies. This information should not be considered in isolation or as a substitute for measure of performance prepared in accordance with IFRS. Readers should refer to "Alternative Performance Measures" section on page 27 of the MD&A for additional information on these measures.

Webcast/Conference Call

Mercator's senior management will hold a conference call and a live audio webcast on November 15, 2012 at 8:30 a.m. Pacific time to discuss results for the third quarter 2012. To participate in the call, dial 877-240-9772 (North America) and 800-2787-2090 (International). To listen to the live webcast, visit www.gowebcasting.com/3844. A presentation will accompany the call and will be available on the company's website under www.mercatorminerals.com/s/Presentations.asp.

An archived recording of the conference call will be available for playback after the event until November 29, 2012 by dialling 1-800-408-3053 (North America), 800-3366-3052 (International) with conference pass code 8809732#.

About Mercator Minerals Ltd.

Mercator Minerals Ltd., a TSX listed Canadian mining company with the potential to have one of the fastest growing base metal profiles in its peer group, is a copper, molybdenum and silver producer with a diversified portfolio of high quality assets in the USA and Mexico. Mercator provides investors exposure to current copper, molybdenum and silver production from the large tonnage long life Mineral Park Mine in Arizona, as well as mid-term exposure to potential copper production from its El Pilar deposit in the State of Sonora in northern Mexico and longer term exposure of molybdenum and copper through the potential development of the El Creston deposit also in the State of Sonora in northern Mexico.

For further information please visit www.mercatorminerals.com.

On Behalf of the Board of Directors

MERCATOR MINERALS LTD.

D. Bruce McLeod, P.Eng., President and CEO

National Instrument 43-101 Compliance

Unless otherwise indicated, Mercator has prepared the technical information in this news release ("Technical Information") based on information contained in the technical reports, news releases, material change reports and quarterly and annual consolidated financial statements and management discussion and analysis (collectively the "Disclosure Documents") available under Mercator Minerals Ltd.'s company profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by or under the supervision of a qualified person (a "Qualified Person") as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administration ("NI 43-101"). Readers are encouraged to review the full text of the Disclosure Documents which qualifies the Technical Information. Readers are advised that mineral resources that are not mineral reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The Technical Information contained in this news release of has been prepared under the supervision of, and its disclosure has been reviewed by the following who are deemed to be Qualified Persons under NI 43-101: Gary Simmerman, BSC, Mining Eng., FAusIMM, Mercator's Vice President, Mineral Park Mine and Mike Broch, BSC Geology, MSSC Economic Geology, FAusIMM, the Company's Vice-President, Exploration and Evaluations.

Forward-Looking Information

This press release contains certain forward-looking information within the meaning of Canadian securities legislation and forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as "forward-looking statements", are not historical facts, are made as of the date of this press release and include without limitation, statements regarding discussions of future plans, guidance, projections, objectives, estimates and forecasts and statements as to management's expectations with respect to, among other things, the size, grade and quality of the Company's mineral reserves and mineral resources, potential mineralization, and possible extensions of zones. In addition, estimates of mineral reserves and mineral resources may constitute forward looking statements to the extent they involve estimates of the mineralization that will be encountered if a property is developed. These forward-looking statements involve numerous risks and uncertainties and actual results may vary. Important factors that may cause actual results to vary include without limitation, certain transactions, certain approvals, changes in commodity and power prices, changes in interest and currency exchange rates, risks inherent in exploration results, timing and success, inaccurate geological and metallurgical assumptions (including with respect to the size, grade and recoverability of mineral reserves and resources), unanticipated operational difficulties (including failure of plant, equipment or processes to operate in accordance with specifications, cost escalation, unavailability of materials, equipment and third-party contractors, delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), political risk, social unrest, and changes in general economic conditions or conditions in the financial markets. In making the forward-looking statements in this press release, the Company has applied several material assumptions, including without limitation, the assumptions that:

(1) market fundamentals will result in sustained copper and molybdenum demand and prices; (2) the current copper leach operations at Mineral Park remain viable, operationally and economically; (3) the milling operations at Mineral Park will continue to be viable, operationally and economically; (4) the financing, construction and operation of the El Pilar Project will proceed as expected; and (5) any additional financing needed will be available on reasonable terms. The Company's ability to progress the El Pilar and El Creston projects towards a construction decision and eventually into production is dependent on the Company's ability to arrange for sufficient funds to cover the capital and start-up related costs. There can be no assurance that the Company will be successful in arranging such funding. Statements concerning mineral reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that may be encountered during current or future operations. The words "guidance", "expect," "anticipate," "estimate," "may," "will," "should," "intend," "believe," "target," "budget," "plan," "projection" and similar expressions are intended to identify forward-looking statements. Information concerning mineral reserve and mineral resource estimates also may be considered forward-looking statements, as such information constitutes a prediction of what mineralization might be found to be present if and when a project is actually developed. The risks and assumptions are described in more detail in the Company's Annual Information Form, audited financial statements and MD&A for the year ended December 31, 2011 on the SEDAR website at www.sedar.com. The Company does not assume the obligation to revise or update these forward-looking statements after the date of this news release or to revise them to reflect the occurrence of future unanticipated events, except as may be required under applicable securities laws.

More Stories By Marketwired .

Copyright © 2009 Marketwired. All rights reserved. All the news releases provided by Marketwired are copyrighted. Any forms of copying other than an individual user's personal reference without express written permission is prohibited. Further distribution of these materials is strictly forbidden, including but not limited to, posting, emailing, faxing, archiving in a public database, redistributing via a computer network or in a printed form.

@ThingsExpo Stories
SYS-CON Events announced today that Super Micro Computer, Inc., a global leader in Embedded and IoT solutions, will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. Supermicro (NASDAQ: SMCI), the leading innovator in high-performance, high-efficiency server technology, is a premier provider of advanced server Building Block Solutions® for Data Center, Cloud Computing, Enterprise IT, Hadoop/Big Data, HPC and ...
18th Cloud Expo, taking place June 7-9, 2016, at the Javits Center in New York City, NY, will feature technical sessions from a rock star conference faculty and the leading industry players in the world. Cloud computing is now being embraced by a majority of enterprises of all sizes. Yesterday's debate about public vs. private has transformed into the reality of hybrid cloud: a recent survey shows that 74% of enterprises have a hybrid cloud strategy. Meanwhile, 94% of enterprises are using some...
WebRTC is bringing significant change to the communications landscape that will bridge the worlds of web and telephony, making the Internet the new standard for communications. Cloud9 took the road less traveled and used WebRTC to create a downloadable enterprise-grade communications platform that is changing the communication dynamic in the financial sector. In his session at @ThingsExpo, Leo Papadopoulos, CTO of Cloud9, will discuss the importance of WebRTC and how it enables companies to fo...
"What we see what happens when you have a completely networked society and the potential to now drive the value creation and the collaboration and the ecosystems that are possible when you start to be able to connect people and industries together in ways that have never been possible before," explained Esmeralda Swartz, VP of Marketing Enterprise & Cloud at Ericsson, in this SYS-CON.tv interview at @ThingsExpo, held November 3-5, 2015, at the Santa Clara Convention Center in Santa Clara, CA.
Cloud computing delivers on-demand resources that provide businesses with flexibility and cost-savings. The challenge in moving workloads to the cloud has been the cost and complexity of ensuring the initial and ongoing security and regulatory (PCI, HIPAA, FFIEC) compliance across private and public clouds. Manual security compliance is slow, prone to human error, and represents over 50% of the cost of managing cloud applications. Determining how to automate cloud security compliance is critical...
SYS-CON Events announced today that IBM Cloud Data Services has been named “Bronze Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. IBM Cloud Data Services offers a portfolio of integrated, best-of-breed cloud data services for developers focused on mobile computing and analytics use cases.
SYS-CON Events announced today that ContentMX, the marketing technology and services company with a singular mission to increase engagement and drive more conversations for enterprise, channel and SMB technology marketers, has been named “Sponsor & Exhibitor Lounge Sponsor” of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2016, at the Javits Center in New York City, New York. “CloudExpo is a great opportunity to start a conversation with new prospects, but what happens after the...
The IoT is changing the way enterprises conduct business. In his session at @ThingsExpo, Eric Hoffman, Vice President at EastBanc Technologies, discuss how businesses can gain an edge over competitors by empowering consumers to take control through IoT. We'll cite examples such as a Washington, D.C.-based sports club that leveraged IoT and the cloud to develop a comprehensive booking system. He'll also highlight how IoT can revitalize and restore outdated business models, making them profitable...
Customer experience has become a competitive differentiator for companies, and it’s imperative that brands seamlessly connect the customer journey across all platforms. With the continued explosion of IoT, join us for a look at how to build a winning digital foundation in the connected era – today and in the future. In his session at @ThingsExpo, Chris Nguyen, Group Product Marketing Manager at Adobe, will discuss how to successfully leverage mobile, rapidly deploy content, capture real-time d...
What a difference a year makes. Organizations aren’t just talking about IoT possibilities, it is now baked into their core business strategy. With IoT, billions of devices generating data from different companies on different networks around the globe need to interact. From efficiency to better customer insights to completely new business models, IoT will turn traditional business models upside down. In the new customer-centric age, the key to success is delivering critical services and apps wit...
As cloud and storage projections continue to rise, the number of organizations moving to the cloud is escalating and it is clear cloud storage is here to stay. However, is it secure? Data is the lifeblood for government entities, countries, cloud service providers and enterprises alike and losing or exposing that data can have disastrous results. There are new concepts for data storage on the horizon that will deliver secure solutions for storing and moving sensitive data around the world. ...
Join us at Cloud Expo | @ThingsExpo 2016 – June 7-9 at the Javits Center in New York City and November 1-3 at the Santa Clara Convention Center in Santa Clara, CA – and deliver your unique message in a way that is striking and unforgettable by taking advantage of SYS-CON's unmatched high-impact, result-driven event / media packages.
In his keynote at 18th Cloud Expo, Andrew Keys, Co-Founder of ConsenSys Enterprise, will provide an overview of the evolution of the Internet and the Database and the future of their combination – the Blockchain. Andrew Keys is Co-Founder of ConsenSys Enterprise. He comes to ConsenSys Enterprise with capital markets, technology and entrepreneurial experience. Previously, he worked for UBS investment bank in equities analysis. Later, he was responsible for the creation and distribution of life ...
SYS-CON Events announced today that MobiDev will exhibit at SYS-CON's 18th International Cloud Expo®, which will take place on June 7-9, 2016, at the Javits Center in New York City, NY. MobiDev is a software company that develops and delivers turn-key mobile apps, websites, web services, and complex software systems for startups and enterprises. Since 2009 it has grown from a small group of passionate engineers and business managers to a full-scale mobile software company with over 200 develope...
SoftLayer operates a global cloud infrastructure platform built for Internet scale. With a global footprint of data centers and network points of presence, SoftLayer provides infrastructure as a service to leading-edge customers ranging from Web startups to global enterprises. SoftLayer's modular architecture, full-featured API, and sophisticated automation provide unparalleled performance and control. Its flexible unified platform seamlessly spans physical and virtual devices linked via a world...
SYS-CON Events announced today that BMC Software has been named "Siver Sponsor" of SYS-CON's 18th Cloud Expo, which will take place on June 7-9, 2015 at the Javits Center in New York, New York. BMC is a global leader in innovative software solutions that help businesses transform into digital enterprises for the ultimate competitive advantage. BMC Digital Enterprise Management is a set of innovative IT solutions designed to make digital business fast, seamless, and optimized from mainframe to mo...
Companies can harness IoT and predictive analytics to sustain business continuity; predict and manage site performance during emergencies; minimize expensive reactive maintenance; and forecast equipment and maintenance budgets and expenditures. Providing cost-effective, uninterrupted service is challenging, particularly for organizations with geographically dispersed operations.
The Internet of Things (IoT) is growing rapidly by extending current technologies, products and networks. By 2020, Cisco estimates there will be 50 billion connected devices. Gartner has forecast revenues of over $300 billion, just to IoT suppliers. Now is the time to figure out how you’ll make money – not just create innovative products. With hundreds of new products and companies jumping into the IoT fray every month, there’s no shortage of innovation. Despite this, McKinsey/VisionMobile data...
The IoTs will challenge the status quo of how IT and development organizations operate. Or will it? Certainly the fog layer of IoT requires special insights about data ontology, security and transactional integrity. But the developmental challenges are the same: People, Process and Platform. In his session at @ThingsExpo, Craig Sproule, CEO of Metavine, will demonstrate how to move beyond today's coding paradigm and share the must-have mindsets for removing complexity from the development proc...
SYS-CON Events announced today TechTarget has been named “Media Sponsor” of SYS-CON's 18th International Cloud Expo, which will take place on June 7–9, 2016, at the Javits Center in New York City, NY, and the 19th International Cloud Expo, which will take place on November 1–3, 2016, at the Santa Clara Convention Center in Santa Clara, CA. TechTarget is the Web’s leading destination for serious technology buyers researching and making enterprise technology decisions. Its extensive global networ...